05 ago
|
Stellantis
|
Toluca de Lerdo
05 ago
Stellantis
Toluca de Lerdo
To plan, coordinate and implement the New Investment Projects for the Toluca Stamping Plant.
To get involved in Investment Studies to make the interconnection forecast and cost with Stellantis Corporation, based on the necessary items to fulfill the requested projects for Plant.
To plan the implementation of the Toluca Stamping Plant projects and get the requested stamping parts in each phase prior to the launch. (TTO, VPA, VPB, VPC).
Strategic
- Manufacturing external costs for the TSP Projects according to the requested items for the plant.
- Elaboration of the Investment for New Studies with a business case focused on recovery of the funds invested.
- Following up to the Labor requisitions to get All WC and BC necessary to ensure a good Project Launching, based on the Press Load analysis.
Operational
- Strategic Action Plan with Die Shop Manager to develop All Engineering changes for the Stamping products.
- Develop a Try out Timings according with the Overview of Stamping Home line Tryout Process.
- Following up and presenting all the Launch activities with Staff of the Plant and Director Complex.
- Plan and coordinate the logistic activities of the equipment, tooling and dies including the administrative activities with the Customs and Governmental and VPE team.
- Analyze the DDP and Scan reports to identify areas to improve and ensure the quality of the product.
- Follow up all the issues detected in Metrology, BCIQ, SCA, DVX and engineering areas.
📌 Launch Manager (Project Rampage) (Toluca de Lerdo)
🏢 Stellantis
📍 Toluca de Lerdo