Data Center Construction Site Foreman (Santiago de Querétaro)

Data Center Construction Site Foreman (Santiago de Querétaro)

27 nov
|
Lambda
|
Santiago de Querétaro

27 nov

Lambda

Santiago de Querétaro

Travel

75% , Sustained on-site presence required at active data center construction and fit-out sites.

What You’ll Do

As a Construction Onsite Foreman, you are Lambda’s eyes, ears, and hands in the field. You will hold daily on-site command of colocation white space fit-outs, high-density compute expansions, and infrastructure upgrades, working under the Data Center Implementation Manager and alongside the Data Center Implementation Project Manager to turn drawings and schedules into installed, energized, and accepted capacity.

You will direct and coordinate trade crews and vendor teams on the floor, sequence work across electrical, mechanical, low voltage, and network scopes, enforce safety and quality standards, and keep material and equipment flowing to the point of install. You will catch field conflicts before they become schedule impacts, escalate what cannot be solved at the site level, and own the daily record of what actually happened on your job.

Key Responsibilities

- Daily Field Supervision:
- Serve as Lambda’s on-site lead for assigned data center projects. Direct daily activity across MEP contractors, low voltage and network installers, rack and integration crews, and OEM field service teams. Run daily huddles, set the day’s priorities, and confirm each crew knows its scope, sequence, and constraints.

- Fit-Out & Installation Oversight:

- Oversee physical execution of white space fit-out work including rack and cabinet setting, containment, busway and branch circuit distribution, r PDU installation, cable tray, structured cabling, liquid cooling and CDU tie-ins, and airflow management. Verify installations match approved drawings and Lambda standards before work is covered or energized.





- Safety Leadership:

- Enforce site safety requirements, energized work permits, LOTO procedures, hot work permits, and PPE compliance. Conduct daily safety walks, stop unsafe work immediately, and lead incident and near-miss reporting with the data center provider and general contractor.

- Quality Control & Inspections:

- Perform in-progress and pre-cover inspections, torque and terminations checks, labeling verification, and workmanship reviews. Build and drive punch lists to closure, rejecting non-conforming work and confirming corrections in the field.

- Trade & Vendor Coordination:

- Deconflict overlapping trade work, sequence access to shared space and shafts, and coordinate outage and switching windows with the data center provider. Escort and manage vendor access, badging, tool and material handling, and site rules compliance.

- OFCI Material Management:

- Receive, inspect, stage, and secure OFCI (Owner-Furnished, Contractor-Installed) equipment. Verify shipments against packing lists and submittals, document damage and shortages immediately, manage laydown and storage areas, and confirm material readiness ahead of each install window.

- Schedule Support & Lookaheads:

- Own the three-week lookahead in the field. Track daily progress against the construction schedule,



flag manpower and material gaps early, and provide the Implementation Project Manager with accurate percent-complete and constraint data.

- Field Documentation & Reporting:

- Produce daily field reports covering manpower counts, work completed, deliveries, delays, safety observations, and photo documentation. Maintain redline markups, RFI and field observation logs, and as-built notes for turnover.

- Issue Resolution & Escalation:

- Resolve constructability conflicts and field questions at the site level where possible. Generate clear RFIs with photos and drawing references when a design or scope decision is needed, and elevate cost, schedule, or safety impacts without delay.

- Commissioning & Turnover Support:

- Support pre-functional checks, Level 1 through Level 4 commissioning activities, and integrated systems testing. Coordinate contractor availability for scripts, witness testing where directed, and drive open-item closure through final acceptance and handoff to Data Center Operations.

- Cross-functional Alignment:

- Work closely with Network Engineering, Data Center Operations, HPC, Supply Chain, and Technical Project Management so that deployment, cabling, and hardware install activities land in the right sequence and space is turned over ready for GPU deployment.

You
- Come from the trades, with a working foreman’s command of how mission-critical space actually gets built, installed, and energized.
- Experienced running crews and vendors in live and occupied data center environments where uptime and adjacency risk are unforgiving.
- Fluent in reading and marking up construction drawings, sing

📌 Data Center Construction Site Foreman (Santiago de Querétaro)
🏢 Lambda
📍 Santiago de Querétaro

Postulate a este anuncio

Muestra tus habilidades a la empresa, rellenar el formulario y deja un toque personal en la carta, ayudará el reclutador en la elección del candidato.

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: data center construction site foreman (santiago de querétaro) / santiago de querétaro

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: data center construction site foreman (santiago de querétaro) / santiago de querétaro