Strategic Production Scheduler: Plan, Align (Ciénega de Flores)

Strategic Production Scheduler: Plan, Align (Ciénega de Flores)

09 oct
|
JCI
|
Ciénega de Flores

09 oct

JCI

Ciénega de Flores

Johnson Controls is seeking a Master Scheduler to develop near-term production plans and align with sales, demand planning, and manufacturing. You will manage the master schedule, coordinate materials, and ensure on-time delivery across the plant while leading cross-functional change management when needed.
The role requires 3–5 years in materials planning or scheduling, a degree in industrial engineering or related field, and familiarity with SAP, Excel, and reporting tools like Tableau or

📌 Strategic Production Scheduler: Plan, Align (Ciénega de Flores)
🏢 JCI
📍 Ciénega de Flores

Postulate a este anuncio

Muestra tus habilidades a la empresa, rellenar el formulario y deja un toque personal en la carta, ayudará el reclutador en la elección del candidato.

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: strategic production scheduler: plan, align (ciénega de flores) / ciénega de flores

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: strategic production scheduler: plan, align (ciénega de flores) / ciénega de flores