MASTER PRODUCTION SCHEDULER
Posting Start Date: 9/21/26
At TE, you will unleash your potential working with people from diverse backgrounds and industries to create a safer, sustainable and more connected world.
Job Description
The Master Scheduler is responsible for owning and maintaining the Master Production Schedule (MPS) at the finished goods level across the tactical horizon of 4 to 13 weeks or the applicable product lead time. This role translates demand and supply plans into a feasible schedule that balances customer commitments, material availability, and plant capacity. By stabilizing the production load and providing a clear, executable plan, the Master Scheduler enables reliable order confirmation and on-time delivery. The role works cross-functionally with supply chain, production, engineering, and customer service to ensure schedule stability and operational excellence.
Job Requirements
Key Responsibilities
Analysis
- Analyze capacity, constraints, lead times, and throughput to optimize production flow.
- Evaluate operational and tactical horizon impacts on the schedule and translate monthly supply plans into weekly executable MPS outputs.
- Monitor schedule adherence, stability, demand changes, and risks to customer delivery.
- Assess material availability and identify potential shortages, bottlenecks, and load imbalances.
- Provide data‑driven insights to SIOP processes and supply chain leadership.
Systems
- Maintain the Master Production Schedule in ERP (SAP preferred) and ensure planning parameters and master data support accurate scheduling.
- Use planning and scenario tools (SAP, IBP, or equivalent) to model alternate scenarios and evaluate feasibility.
- Drive system accuracy through participation in UAT, validation activities, and process changes impacting scheduling.
- Monitor and report key scheduling and service metrics using system‑generated data.
Collaboration
- Serve as the liaison between integral Supply Planners and plant operations
📌 Master Scheduler (Tijuana)
🏢 Flex
📍 Tijuana