25 sep
|
Kion Group
|
Centro
Integral Opportunities Learn More Here: Learn More Here: Key Responsibilities: Own the MPS: Define and manage the Master Production Schedule end-to-end (what & when), ensuring stability while enabling controlled changes. Plan with constraints: Convert demand into a capacity-feasible plan , anticipating bottlenecks and driving recovery actions. Align execution: Synchronize MPS with MRP, Purchasing, and Operations ; lead weekly alignment on build, kit, and ship priorities. Drive priorities: Translate business needs into a clear must-build / must-ship plan and lead scenario-based decisions. Ensure data & systems excellence: Own planning master data and act as SAP power user to guarantee reliable execution. Own performance: Track KPIs (Schedule Adherence, OTIF, Plan Stability), lead root-cause analysis, and drive continuous improvement.
Weekly/monthly MPS + exception management Capacity outlook with recovery plans Order release strategy (what / when / why) Clear priorities translated to shop-floor execution KPI dashboards with actionable insights Required Qualifications: Bachelor’s degree in Industrial Engineering, Supply Chain, Operations, or related. +5–8 years of experience in: Production Scheduling Production Planning within manufacturing plants Proven hands-on experience with: Production order creation and management Manufacturing execution Strong experience in SAP PP (Production Planning) (MM-only profiles will not be considered). Strong analytical and problem-solving skills. Experience working in capacity-constrained environments . Advanced Excel skills. English proficiency (written and verbal). #J-18808-Ljbffr
📌 Master production scheduler (Centro)
🏢 Kion Group
📍 Centro