24 sep
|
Johnson Controls
|
Ciénega de Flores
24 sep
Johnson Controls
Ciénega de Flores
Johnson Controls is seeking a Master Scheduler to develop and manage production schedules across the plant, coordinating with sales, logistics, and manufacturing to align resources and meet delivery dates.
The role emphasizes leveraging data analysis, ERP data, and BI tools to report on plant status, forecast demand, and optimize costs. Collaborative planning and continuous improvement are core to this position.
#J-18808-Ljbffr
📌 Production Master Scheduler: Optimize Plans & Align Teams (Ciénega de Flores)
🏢 Johnson Controls
📍 Ciénega de Flores