21 ago
|
Telekomplex
|
México
21 ago
Telekomplex
México
Telekomplex is looking for a highly experienced
Oracle Primavera P6 EPPM Technical Architect / Upgrade Engineer
to support a customer project involving the modernization of a long-running
on-premises Primavera P6 EPPM environment
.
This is a
hands-on technical upgrade and migration engagement
. We are not looking for a Primavera scheduler or functional planning consultant.
The idóneo professional has personally executed complex
P6 EPPM version upgrades
, including the underlying database, operating system, Java/application server stack, configuration, testing, and production cutover.
Project Scope
The engagement includes:
- Assessment of an existing Oracle Primavera P6 EPPM environment
- Identification of the current P6 version and supported upgrade path
- Design of the target P6 EPPM architecture
- Build and configuration of a new parallel environment
- Installation and configuration of the required P6 EPPM components
- Microsoft SQL Server installation and configuration
- P6 database migration and upgrade
- Execution of intermediate upgrade steps where required
- Java runtime and application server configuration
- Reproduction of existing P6 administration and security configuration
- Authentication, certificates and integration configuration
- Multiple rehearsal upgrades using copies of the production database
- Technical validation and troubleshooting
- Performance and backup validation
- Production cutover planning and execution
- Rollback / go-no-go planning
- Post-cutover stabilization
- As-built documentation and operational handover
Required Experience
We are looking for strong hands-on experience with:
- Oracle Primavera P6 EPPM
- P6 EPPM installation, configuration and administration
- P6 EPPM version upgrades
- P6 database upgrade procedures
- Oracle-supported upgrade paths and compatibility matrices
- Microsoft SQL Server
- Windows Server
- Java runtime environments
- Enterprise application server configuration
- P6 authentication and security conf
📌 Senior Oracle PrimaveraEPPM Technical (México)
🏢 Telekomplex
📍 México