Senior Oracle PrimaveraEPPM Technical (México)

Senior Oracle PrimaveraEPPM Technical (México)

20 ago
|
Telekomplex
|
México

20 ago

Telekomplex

México

Telekomplex is looking for a highly experienced Oracle Primavera P6 EPPM Technical Architect / Upgrade Engineer to support a customer project involving the modernization of a long-running on-premises Primavera P6 EPPM environment.
This is a hands-on technical upgrade and migration engagement. We are not looking for a Primavera scheduler or functional planning consultant.
The adecuado professional has personally executed complex P6 EPPM version upgrades, including the underlying database, operating system, Java/application server stack, configuration, testing, and production cutover.
Project Scope
The engagement includes:
Assessment of an existing Oracle Primavera P6 EPPM environment
Identification of the current P6 version and supported upgrade path
Design of the target P6 EPPM architecture
Build and configuration of a new parallel environment
Installation and configuration of the required P6 EPPM components
Microsoft SQL Server installation and configuration
P6 database migration and upgrade
Execution of intermediate upgrade steps where required




Java runtime and application server configuration
Reproduction of existing P6 administration and security configuration
Authentication, certificates and integration configuration
Multiple rehearsal upgrades using copies of the production database
Technical validation and troubleshooting
Performance and backup validation
Production cutover planning and execution
Rollback / go-no-go planning
Post-cutover stabilization
As-built documentation and operational handover
Required Experience
We are looking for strong hands-on experience with:
Oracle Primavera P6 EPPM
P6 EPPM installation, configuration and administration
P6 EPPM version upgrades
P6 database upgrade procedures
Oracle-supported upgrade paths and compatibility matrices
Microsoft SQL Server
Windows Server
Java runtime environments
Enterprise application server configuration
P6 authentication and security configuration
P6 integrations and dependencies
Database backup, resto

📌 Senior Oracle PrimaveraEPPM Technical (México)
🏢 Telekomplex
📍 México

Postulate a este anuncio

Muestra tus habilidades a la empresa, rellenar el formulario y deja un toque personal en la carta, ayudará el reclutador en la elección del candidato.

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: senior oracle primaveraeppm technical (méxico) / méxico

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: senior oracle primaveraeppm technical (méxico) / méxico