13 ago
|
Stellantis
|
Toluca de Lerdo
13 ago
Stellantis
Toluca de Lerdo
Evaluate next Model Year Process Sheets to support Budget submission using AMPS
and predetermined time analysis
Review and implement Model Year changes
Participate in WPI/OTP for future programs
Improve productivity by eliminating waste and balance work loads.
Update AMPS 3 to maintain headcount, times, scroll, material usage and vehicle
safety requirements
Deliver by using AMPS the standardized documentation to the production areas:
SWI
Define standards for as required and non productive material. Standardize
methods between teams and shifts
Manpower control of current authorization and Update Productivity KPI's
Overtime control and approval.
Qualifications
Plant Experience as Industrial Engineer, Continuous Improvement, Operational
Excellence.
Lean Manufacturing Predetermined Time Analysis: MTM-UAS or Modapts Office or
Google apps. AutoCAD Solid Works Teamcenter
📌 Industrial Engineer (Toluca de Lerdo)
🏢 Stellantis
📍 Toluca de Lerdo